Most of the frame reassembly took place on 6/2/07. However, the work had to be stopped before the final pieces were in place because a thunderstorm came up around 6PM. Therefore, over a period of several days, HHS volunteers (without use of a crane) put the final pieces in place.
This gallery shows work done on 6/11/07 - the final purlin being installed (Dave DeGagne on the top!) and the traditional bough being placed on the top at the finish.
Click a thumbnail to see the individual image page.